OPERATION & MAINTENANCE
DOCUMENTATION GT 11
DC & UPS SYSTEM
Owner’s Consultants
Owner
ESB International
PETRO VIETNAM
PECC2
Employer’s Consultant
Employer
VIETNAM MACHINERY
ERECTION CORPORATION
-
Power Island Contractor
ALSTOM (Switzerland) Ltd.
Project
NHON TRACH 1 CCPP, VIETNAM
ALSTOM-Doc.-Nr.
NHT/11/G/BR_BT-----/MM/070
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without
express authority is strictly forbidden.
© STATRON 2003
Statron AG · Industrie Nord · CH-5506 Mägenwil · TEL. ++41 62 887 4 887 · FAX ++41 62 887 4 888 ·
[email protected]
Rev.
Description
Date
Issued
Checked
Approved
Page / of
0
Emission
17.07.2007 J.Hunger
E.Bieri
J.Hunger
1/2
M311540-11-2
(1)
Chap.
Document Nr.
Description
1
M640004-E
Erection, Assembly, Shipping
and Handling Instructions
Single line & Layout of Equipment
A311540-010
NHT/00/G/BR_BT-----/WD/101
M311540-01-1
Cable List DC&UPS System
2
M311540-21
C69BA2F0001AA000
00-307439
7140203191_install
7140203051_commiss
7140203021_operating
GroE_en0107
Battery Sizing Data
Battery Rack Drawing
Battery Wiring Diagram
Battery Installation-Manual
Battery Commissioning-Manual
Battery Operating-Manual
Battery Data Sheet
3
S311540-110
NHT/11/G/BT--------/WD/102
S311540-111
NHT/11/G/BT--------/WD/103
Set of Drawings & Partslist (BTL10 )
S311540-120
NHT/11/G/BR--------/WD/102
S311540-121
NHT/11/G/BR--------/WD/103
Set of Drawings & Partslist (BRU10, BRA10/20)
S311540-130
NHT/11/G/BT--------/WD/105
S311540-131
NHT/11/G/BT--------/WD/106
S311540-132
NHT/11/G/BT--------/WD/107
Set of Drawings & Partslist (BUA10)
4
5
Set of Drawings & Partslist (BTM10 )
(Dimensions/Layout/Terminal list/Wiring Diagrams)
Set of Drawings & Partslist (BRU20, BRB10/20)
Set of Drawings & Partslist (BUB10)
Set of Drawings & Partslist (BUC10/20)
(Dimensions/Layout/Terminal list/Wiring Diagrams)
6
T311540-100
NHT/11/G/BR_BT-----/EM/090
Factory Routine Test Reports
7
M311540-11
System Description
8
M621005E
Battery Charger O&M
M311540-13
Technical Data Battery Charger
M653006E
UPS / Inverter O&M
M311540-16
Technical Data UPS / Inverter
M311540-17
220V DC Distribution O&M
9
10
page 2
(2)
M311540-11-2
STATRON AG, Switzerland
Describtion:
Type
DC & UPS
Revision:
B
Doc.-type:
Prepared:
Checked:
Approved:
J.Hunger
H.Würsch
J.Hunger
Valid for:
File no.:
MANUAL
Replaces:
IS2 Cabinets
M640004-E
Language:
Page:
E
Order-nbr.:
general
1/13
Data set:
02.05.2007
ERECTION, ASSEMBLY, SHIPPING
&
HANDLING INSTRUCTIONS
for
DC and UPS System
(in IS2 cabinets)
Q:\MANUALS\Allgemein\640004\M640004-E.doc
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to
third parties without express authority is strictly forbidden.
STATRON 2007
Statron AG · Industrie Nord · CH-5506 Mägenwil · TEL. ++41 62 887 4 887 · FAX ++41 62 887 4 888
(3)
Page:
2/13
This side intentionally left blank
(4)
File no.:
M640004-E
Page:
3/13
File no.:
M640004-E
Table of Contents
1
HANDLING........................................................................................................................................................4
1.1
1.2
1.3
2.
ERECTION ........................................................................................................................................................7
2.1
2.2
2.3
2.3.1
2.4
2.5
3.
EQUIPMENT DESCRIPTION ...........................................................................................................................4
INTERMEDIATE STORAGE ............................................................................................................................4
TRANSPORT .................................................................................................................................................5
CHECKS ON DELIVERY .................................................................................................................................7
CONSTRUCTIONAL REQUIREMENTS .............................................................................................................7
ERECTION AND CONNECTION OF THE CUBICLES ...........................................................................................8
Additional informations for switchgear positioning ..............................................................................9
FASTENING METHODS TO FOUNDATION .......................................................................................................9
DRIP PROTECTION ROOF (OPTIONAL) .........................................................................................................12
CABLE CONNECTIONS, WIRING .............................................................................................................13
(5)
Page:
File no.:
4/13
1
M640004-E
HANDLING
1.1 Equipment Description
General
The critical source panels, i.e. chargers, inverters and
distribution boards are built-up of single cabinets in fixed
technique. The basic elements of the frames are Csections of 2mm thick sheet steel with holes at 25mm
intervals. The parts of the frame are secured with threadforming screws and require no maintenance. The single
cabinets are separated by separation walls. The cabinets
are equipped with rear plates, hinged front doors and end
plates.
1.2 Intermediate Storage
The nature and duration of intermediate storage are
dependent on the type of packaging.
Cubicles in standard packaging
Cubicles with export/
seaworthy packaging
Store indoors after arrival where no condensation can
occur. Unpack immediately. Open the doors for several
hours to acclimatize the equipment. Cover the cubicles
with plastic sheeting for any subsequent storage periods.
Check regularly for condensation forming under the
sheeting until the start of installation.
• Moisture protection is only guaranteed if the
packaging is undamaged.
• Possibility of intermediate storage outdoors.
• Storage period of maximum 12 months if wrapped in
heat sealed PE sheeting and the packaging is
undamaged.
• When the storage period is exceeded, the drying
agent must be replaced and the plastic sheeting has
to be resealed.
If condensation occured don't commission the unit until
it is completely dry. Open the doors for several hours to
acclimatize the unit or run the cubicle heaters for 2-3
days.
(6)
Page:
File no.:
5/13
1.3
M640004-E
Transport
The unpacked cabinets can be transported by crane or
fork-lift snuck.
By fork-lift truck
Switchgear cubicles have to be transported only in the
vertical position.
Tilting and canting must be avoided.
Cubicles may easily tip over when transported
with a hand-pulled truck. Therefore the
distance between the wooden cross beam or
the pallet and the underground should not be
more than 3 mm.
(7)
Page:
6/13
By crane
(8)
File no.:
M640004-E
Page:
7/13
File no.:
M640004-E
2. ERECTION
2.1 Checks on delivery
Check the consignment on arrival at site for:
•
•
•
•
Completeness
transport damage (if found, determine extent, cause and
originator).
When damage is detected it must be proceeded as
follows:
Immediately write down visible damage in the
consignment note.
Report hidden damage in writing to the relevant
forwarding agent within one week.
When certification is missing or a claim has not been
made, the manufacturer can disclaim all liability.
2.2 Constructional requirements
To prevent damage being caused by moisture and dirt
the following tasks (only examples) must be carried out
before erection of the switchgear:
•
•
•
•
•
Walls and ceilings DRY, painting completed.
Doors and windows installed.
Openings in the floor, wall and ceiling for cables,
conductors pipes, bars and ventilation in accordance
with the construction drawings provided.
Supporting brackets, beams, enclosures and foundation
frames assembled and painted.
If necessary, assemble braces appropriate to the basic
dimensions of the switchgear installation with cross struts
corresponding to the cubicle divisions.
Suitable indoor conditions must be maintained. Adequate
lighting as well as free access to the switchgear rooms
must be provided. Excessive temperature fluctuations
together with high humidity should be prevented by
heating the room. Condensation should also be
prevented.
(9)
Page:
8/13
File no.:
M640004-E
2.3 Erection and connection of the cubicles
The erection of the cubicles should be carried out, as
described the following:
The shipping units which are to be erected in one row
have to be aligned accurately and checked that they
are vertical. Doors and panels must not be twisted or
stressed. The erection can start at the left or at the right.
The frames of the shipping units have to be screwed
together. The vertical sections are already fitted on the
front and rear with special nuts.
Note: for protection class IP5x and
higher or IPx1 and higher the rubber
seal has to be be attached between
the frames.
Additionally to the vertical sections or if the access to the
joints in the vertical sections is obstructed, the bottom
sections can be screwed together using the frame
connectors which are enclosed .
(10)
Page:
9/13
File no.:
M640004-E
The protective conductor (PE or PEN) is to be connected
to the PE/PEN bar. Additional connections to the central
earthing system can be made at any point of the
perforated PE/PEN bar. Local regulations must be
complied with.
The lifting angles may be removed and afterwards the
fastening holes have to be plugged with attached plug.
2.3.1 Additional informations for switchgear
positioning
The area around the cubicles to be left clear should be at
least 80 mm.
To be able to mount the last (right) cubicle, the distance
between the end cubicle and the (right) wall must be at
least 150 mm.
In case of left-mounted doors, the minimal distance
between the (left) wall and the (left) end cubicle should
be also 150 mm, such that the door can be opened in an
angle of more than 90°.
The distance from the upper edge of the (highest) cubicle
to the ceiling should be at least 500 mm for cubicles with
ventilation grids on the top .
2.4
Fastening methods to foundation
The erection of switchgears having the cable entries at
the bottom requires a foundation with an opening, a
cable duct or a special base frame.
•
•
The cubicles should preferably be erected on a base
frame which is either
embedded in the concrete floor or
rests as false floor on supports.
When erecting the base frame the following must be
observed:
•
The base frame should be aligned and checked under
the supervision of a suppliers fitter.
•
The horizontal tolerance of the frame must not exceed
+1 mm over a length of 1 m. This is to be ensured by using
suitable levelling devices (e.g. spirit level, 1 m long
surveyors rod).
(11)
Page:
10/13
•
M640004-E
The frame must not ondulate
(
•
File no.:
2/1000
according to DIN ISO 1101)
The levelling of base frames can be performed e.g. with
PRESTOJACK levelling spindles.
During erection the switchgear is welded or screwed to
the base frame.
(12)
•
The length of the weld seams at the front and rear of
each cubicle should not be less than 20 mm. All weldings
must be protected against corrosion by a coat of paint
(e.g. zinc paint).
•
The screwed connection is carried out through the
transverse section. The mounting holes required for metal
straddling dowels M 10 must be drilled during erection.
Page:
11/13
File no.:
M640004-E
When false floors are used, notice that:
•
Tolerances are the same as for the base frame.
•
The subsoil must be fimm, so that the tolerances are not
exceeded by settling of the soil (especially when using
insulation layers and adhesives).
•
The false floor has to have a carrying capacity of
p=20 kN/m2 (Compression load from top to bottom).
During erection the switchgear is welded or screwed to
the false floor.
•
The length of the weld seams at the front and rear of
each cubicle should not be less than 20 mm. Then a
reliable earth connection is provided. All weldings must be
protected against corrosion by a coat of paint (e.g. zinc
paint).
•
If welding is not possible, the switchgear can be bolted to
the false floor. The necessary mounting holes should be
drilled on site.
Care should be taken to ensure that the base sections of
each cubicle rests evenly on the supports. Taking into
account the bending radius of the cables and adequate
accessibility, a minimum floor height of 500 mm is
recommended.
(13)
Page:
12/13
2.5
File no.:
M640004-E
Drip protection roof (optional)
A drip proof top is only recommended if tubes containing
water or other solvents are placed above the cubicles.
The top shall be installed only after the cubicles are
placed and screwed together.
Mount the lifting bolts (or tubes) and install the tops.
Note: for protection degree >IP40
the delivered rubber foam gasket
must be applied between the cabinets
(see chapter 2.3)
FRONT
VIEW
(14)
Page:
13/13
3.
File no.:
M640004-E
CABLE CONNECTIONS, WIRING
•
Power and control cables are to be attached to the
cable mounting rails in the cable compartment.
•
Power and control cables are to be stripped off their
jacket below the connections of each module.
•
Before fastening the cables at the power terminals they
must be supported or bended so that no tension or
pressure is exerted on the cable connection unit.
•
Control cables with individual conductors to be
connected to several different terminal blocks are to be
stripped within the cable compartment.
Prior to fastening any feeder-, load- or control cable the
protective conductor (PE or PEN) must be connected to
the cabinet ground bar.
The continuous connection of the protective conductor
circuits to inactive metal parts of the building (in
accordance with IEC 60439 or DIN VDE 0100 Part 540) is to
be carried out according to the conditions at the erection
site.
The terminal list is part of the Set of Drawings , for each
cabinet, on the pages with group nr. ..-040 ... 099.
(15)
© Statron AG, Industrie Nord, CH-5506 Mägenwil
Alle Rechte vorbehalten.
Tous droits réservés / All rights reserved
TEL.: +41 (0)62 887 4 887 FAX: +41 (0)62 887 4 888
1
2
3
4
5
Seite
Titel:
last Rev. modified pages
page
title:
letzte Rev. geänderte Seiten
000
COVER SHEET / SUMMARY
1
X
001
SYMBOLS & LETTERS INDEX
A 2
010
SINGLE LINE 220V DC CHARGER + MAIN DCDB
3
X
011
SINGLE LINE 220V DC SUB-DISTRIBUTION
X
4
SINGLE LINE 230V AC UPS + DISTRIBUTION
012
X
5
020
CONTAINER LAYOUT
6
PANEL DIMENSIONS 1
021
7
022
PANEL DIMENSIONS 2
8
FOOTPRINT OF CABINETS
023
9
10
B 11
12
13
14
15
16
17
18
19
C 20
21
22
23
Owner
24
25
26
27
28
D 29
EPC Contractor
30
31
32
33
34
35
36
Subcontractor
37
E 38
39
Project
40
41
42
43
Owner's Identification No.
44
45
46
F -GT / DC UPS SYSTEM
6
7
8
DC / UPS SYSTEM
A
..BTL10, ..BTM10, ..BTA10GS100, ..BTB10GS100
..BTA10, ..BTB10
..BUA10, ..BUB10, ..BUC10, ..BUC20
..BRU10, ..BRA10, ..BRA20
..BRU20, ..BRB10, ..BRB20
NHON TRACH 1 CCPP,VIETNAM
Rev. D
ORIGINAL
(16)
24.07.07
J.Hunger
P.Zeller
J.Hunger
08.03.07
ZELLER
HUNGER
MOUTRAGI 1xKA13E2-2
DATUM/DATE GEZ./DRAWN GEP./APPR. FREIG/REL. --
1
2
3
11/12
SWITZERLAND
--
--
4
C
Owner's Consultants
D
Issued by
E
EPC Contractor Identification No.
ALSTOM Document code
NHT/00/G/BR_BT-----/WD/101
001
AUFTR.-NR : 311540
-CY
DOC-Nr.
SYSTEM OVERVIEW
COVER SHEET / SUMMARY
5
B
UNIT
=
+
SEITE/PAGE
VON/OF
H - A311540 - 010 - 000
6
7
9
8
F
© Statron AG, Industrie Nord, CH-5506 Mägenwil
TEL.: +41 (0)62 887 4 887 FAX: +41 (0)62 887 4 888
1
2
SYMBOL/LETTER
L1 L2 L3
PHASE SEQ
PHI/FREQ
U high voltage
low & high voltage
EF earth fault
printed circuit
board (sample)
12 3 4 56
-A35
3
printed circuit board, monitoring relay
aux. power supply
A
A
DESCRIPTION
Alle Rechte vorbehalten.
Tous droits réservés / All rights reserved
8
transformers
voltage transformer
A
measuring equipment
A
F
auto-transformer
indicating instrument
V = voltmeter
A = ammeter
F = frequency meter
auto-transformer with
voltage regulation
current transformer
Q
switching devices for power circuits
B
U
converter
battery, accumulator
B
signal lamp with LED (light emitting diode)
hygrostat
(humidity sensor, can be
combined with temperature)
2
rH
1
C
signal lamp with bulb / cabinet light
K
relays, contactors
fused switch-disconnector
relay coil
general symbol
relay coil
time delay function
D
t
9
4-20mA
+ 10 11 12
+15
-15
O/P
R
time delay relays
left: defined function
right: multi function
zener diode
breakdown diode
IGBT
insulated-gate bipolar transistor
terminals, plugs, sockets
terminal, screw-/bolt-terminal
terminal, wire-wrap / termipoint
plug / socket terminal
plug socket
break contact
left: delayed when activated
right: delayed when de-activated
cable adapter
(ribbon cable to single wire)
M1
switch with automatic return
operated by pushing
switch with non-automatic return
operated by pushing
switch with non-automatic return
operated by turning
key operated switch (can be combined
with the above options)
make contact
left: delayed when de-activated
right: delayed when activated
E
switching devices for control circuits
1-20
S
change over contact
break before make
cabinet heater
F
X
CN1
fan
Z
filters, limiters
varistor
voltage depend resistor
transient suppressor
R-C unit
radio interference filter
EMI filter
000
NHON TRACH 1 CCPP,VIETNAM
Rev. D
ORIGINAL
24.07.07
J.Hunger
P.Zeller
J.Hunger
08.03.07
ZELLER
HUNGER
MOUTRAGI 1xKA13E2-2
DATUM/DATE GEZ./DRAWN GEP./APPR. FREIG/REL. --
1
2
3
GT / DC UPS SYSTEM
11/12
SWITZERLAND
--
--
4
D
thyristor
resistors
shunt resistor with separate
current and voltage terminals
break contact
LEM transmitter
Hall effect current transmitter
diode
resistor, general
make contact
C
semiconductors
miscellaneous
M
E
measuring transmitter
with galvanic isolation between
input, output and aux. voltage supply
V
left: resistor with adjustable tap
right: potentiometer
E
3
2
230VAC
1
relay coil
bistable (remanence) relay
delay devices
F
M8742
7+
0..300VDC
8-
mcb, miniature circuit breaker
with thermal and magnetic release
1-pole / 2-pole / 3-pole (ppower circuits)
key lockable handle
for circuit breakers and
switch-disconnectors
non polarized capacitor
for AC or DC voltage
t
converter
left: AC to DC (rectifier/charger)
right: DC to AC (inverter)
circuit breaker
MCCB moulded case circuit breaker
general / detailed symbol
capacitors
polarized capacitor
for DC voltage
D
switch-disconnector
(on load isolating switch)
-
signalling device
M
H
(shown in low temp status)
C
converter
left: AC to AC
right: DC to DC
+
thermostat, thermo contact
3
disconnector (isolator)
thermostat, thermo contact
SYSTEM OVERVIEW
SYMBOLS & LETTERS INDEX
5
6
AUFTR.-NR : 311540
-CY
DOC-Nr.
UNIT
010
=
+
SEITE/PAGE
VON/OF
H - A311540 - 010 - 001
7
9
8
(17)
F
© Statron AG, Industrie Nord, CH-5506 Mägenwil
TEL.: +41 (0)62 887 4 887 FAX: +41 (0)62 887 4 888
1
2
Alle Rechte vorbehalten.
Tous droits réservés / All rights reserved
3
4
..BMA
5
6
7
8
..BMA
3 x 400V, 50Hz
A
A
3x100A
3P
BTL10
GS100
3x100A
3P
BTM10
GS100
230VAC
230VAC
-X90
BATTERY 220V
108 x GroE 425
425Ah/10h
-X01
-X90
-X01
H
BTL10
-Q1
80A
80A
-Q1
BATTERY 220V
108 x GroE 425
425Ah/10h
H
BTM10
B
B
BTA10
CHARGER
220BDT200
220V/166A
CHARGER DISTURBED
-X10
CHARGER FAILURE
-X10
CHARGER
220BDT200
220V/166A
-X11
CHARGER FAILURE
-X11
160A
C
A V
V A
NOTE:
BUC00GS100 closed
only when one of
Q2 in BTL or BTM
is open!
-Q2
U/I/F
DIGITAL
C
-Q2
BTL00
GS100
-Q9
±300A
±300A
-X04
-X04
A
+
-X14
160A
+
U/I/F
DIGITAL
300V
200A
BATTERY FAILURE
200A
300V
BATTERY FAILURE
-X13
BTB10
CHARGER DISTURBED
A
315A
-X15
-X15
DIST
FAILURE
-X90
-X02b
315A
BUA10
GS100
BUB10
GS100
BTB10
GS100
27 59
220V DC
BUA10
BUB10
D
DIST
FAILURE
A 250A
250A A
300V V
-X15
-F10
250A
250A
BTA10
GS100
D
230VAC
H
315A
230VAC
H
-X90
-F10
-X02b
V 300V
59 27
220V DC
ACT.VAL.
VOLTAGE
ACT.VAL.
VOLTAGE
TO INVERTER
BRU10
-X02
-X02
-X02
NHON TRACH 1 CCPP,VIETNAM
24.07.07
J.Hunger
P.Zeller
J.Hunger
08.03.07
ZELLER
HUNGER
MOUTRAGI 1xKA13E2-2
DATUM/DATE GEZ./DRAWN GEP./APPR. FREIG/REL. --
1
-X02
TO DISTRIBUTION
BUC10
001
(18)
CF
BUC10
GS101
2
3
27
UNDERVOLTAGE RELAY
59
OVERVOLTAGE RELAY
SWITZERLAND
--
4
-X02
BRU20
GS101
SYSTEM OVERVIEW
SINGLE LINE DIAGRAM CHARGER
5
6
E
-X02c
TO INVERTER
BRU20
TO DISTRIBUTION
BUC10
GT / DC UPS SYSTEM
11/12
--
-X02
BUC10
GS102
63A
63A
-X02c
CF
200A
BRU10
GS101
E
Rev. D
ORIGINAL
-X16
-X01
200A
-X01
F
-X16
-X16
011
AUFTR.-NR : 311540
-CY
DOC-Nr.
UNIT
=BTL/BUA/BTM/BUB
+
SEITE/PAGE
VON/OF
H - A311540 - 010 - 010
7
9
8
F
© Statron AG, Industrie Nord, CH-5506 Mägenwil
TEL.: +41 (0)62 887 4 887 FAX: +41 (0)62 887 4 888
1
2
Alle Rechte vorbehalten.
Tous droits réservés / All rights reserved
3
4
5
6
7
8
A
A
FROM DISTRIBUTION
BUA10
BUC10GS101
FROM DISTRIBUTION
BUB10
BUC10GS102
B
B
230VAC
-X01a
-X17
-X17
DIST
FAILURE
-X01b
A
A
200A
200A
-X90
BUC10
H
300V V
C
C
64 27 59
BUC20
MO
BUC20
GS101
2,3A
ROBA
HTCT323470
D
MO
46/15A
ELOP
HTCT322923
MO
16A
JOP 2
HTCT323471
16A
JOP 1
HTCT323471
220V DC
MO
CF
CF
D
-X02
-X02
-X02
-X02
E
F
E
27
UNDERVOLTAGE RELAY
59
OVERVOLTAGE RELAY
64
EARTH FAULT RELAY
010
012
NHON TRACH 1 CCPP,VIETNAM
Rev. D
ORIGINAL
24.07.07
J.Hunger
P.Zeller
J.Hunger
08.03.07
ZELLER
HUNGER
MOUTRAGI 1xKA13E2-2
DATUM/DATE GEZ./DRAWN GEP./APPR. FREIG/REL. --
1
2
3
GT / DC UPS SYSTEM
11/12
SWITZERLAND
--
--
4
SYSTEM OVERVIEW
SINGLE LINE DIAGRAM 220VDC
5
6
AUFTR.-NR : 311540
-CY
DOC-Nr.
UNIT
=BUC10/BUC20
+
SEITE/PAGE
VON/OF
H - A311540 - 010 - 011
7
9
8
(19)
F
© Statron AG, Industrie Nord, CH-5506 Mägenwil
TEL.: +41 (0)62 887 4 887 FAX: +41 (0)62 887 4 888
1
2
Alle Rechte vorbehalten.
Tous droits réservés / All rights reserved
3
FROM BUA10
BRU10GS101
220V DC
A
4
5
6
FROM BUB10
BRU20GS101
220V DC
3x400/230VAC, 50Hz ..BJA
50A
2P
7
3x400/230VAC, 50Hz ..BJA
A
=BRU10GS103
230VAC
-X90
-X01a
-X01a
-X01c
H
BRU10
B
-X90
-X01c
H
400V
230V
BRU20
INVERTER
IDS 020 2V2
15kVA
DISTURBED
B
V
300V
-X41
FAILURE
-X41
INVERTER
IDS 020 2V2
15kVA
DISTURBED
300V
FAILURE
U/I/F
DIGITAL
Hz V A
C
MANUAL BYPASS
SWITCH
100A
47-53Hz
MANUAL BYPASS
SWITCH
300V
U/I/F
DIGITAL
100A
300V
C
47-53Hz
15kVA
-Q11
V
-X40
400V
230V
15kVA
-Q11
-X40
=BRU20GS103
50A
2P
230VAC
8
Hz V A
D
D
Neutral earthed
Neutral earthed
BRA20
BRB20
BUSBAR DISTURBED
-X45
-X45
ACT. VAL. VOLTAGE
BUSBAR DISTURBED
-X47
ACT. VAL.
VOLTAGE
-X47
-X46
BUSBAR DISTURBED
-X46
~
ACT. VAL. VOLTAGE
ACT. VAL.
VOLTAGE
~
230VAC
~
230VAC
BRA10
BRB10
CF
-X02
E
CF
-X02
-X02
-X02
-X02
LOAD max. 12kVA, p.f. 0.8 ind.
F
-X48
BUSBAR DISTURBED
~
E
-X48
-X02
-X02
-X02
LOAD max. 12kVA, p.f. 0.8 ind.
011
020
NHON TRACH 1 CCPP,VIETNAM
Rev. D
ORIGINAL
(20)
24.07.07
J.Hunger
P.Zeller
J.Hunger
08.03.07
ZELLER
HUNGER
MOU TRAGI 1xKA13E2-2
DATUM/DATE GEZ./DRAWN GEP./APPR. FREIG/REL. --
1
2
3
GT / DC UPS SYSTEM
11/12
SWITZERLAND
--
--
4
SYSTEM OVERVIEW
SINGLE LINE DIAGRAM 230VAC
5
6
AUFTR.-NR : 311540
-CY
DOC-Nr.
UNIT
=BRU10/BRA10/BRU20/BRB10
+
SEITE/PAGE
VON/OF
H - A311540 - 010 - 012
7
9
8
F