Đăng ký Đăng nhập
Trang chủ Kỹ thuật - Công nghệ Cơ khí chế tạo máy Ebook 2013 asme bpvc i - rules for construction of power boilers...

Tài liệu Ebook 2013 asme bpvc i - rules for construction of power boilers

.PDF
370
154
120

Mô tả:

2013 ASME Boiler and Pressure Vessel Code AN INTERNATIONAL CODE I Rules for Construction of Power Boilers 1. 2013 ASME FINAL Covers_I MECH 5.9.indd 1 5/15/13 5:02 PM AN INTERNATIONAL CODE 2013 ASME Boiler & Pressure Vessel Code 2013 Edition July 1, 2013 I RULES FOR CONSTRUCTION OF POWER BOILERS ASME Boiler and Pressure Vessel Committee on Power Boilers Two Park Avenue • New York, NY • 10016 USA Date of Issuance: July 1, 2013 This international code or standard was developed under procedures accredited as meeting the criteria for American National Standards and it is an American National Standard. The Standards Committee that approved the code or standard was balanced to assure that individuals from competent and concerned interests have had an opportunity to participate. The proposed code or standard was made available for public review and comment that provides an opportunity for additional public input from industry, academia, regulatory agencies, and the publicat-large. ASME does not “approve,” “rate,” or “endorse” any item, construction, proprietary device, or activity. ASME does not take any position with respect to the validity of any patent rights asserted in connection with any items mentioned in this document, and does not undertake to insure anyone utilizing a standard against liability for infringement of any applicable letters patent, nor assume any such liability. Users of a code or standard are expressly advised that determination of the validity of any such patent rights, and the risk of infringement of such rights, is entirely their own responsibility. Participation by federal agency representative(s) or person(s) affiliated with industry is not to be interpreted as government or industry endorsement of this code or standard. ASME accepts responsibility for only those interpretations of this document issued in accordance with the established ASME procedures and policies, which precludes the issuance of interpretations by individuals. The endnotes in this document (if any) are part of this American National Standard. ASME collective membership mark Certification Mark The above ASME symbol is registered in the U.S. Patent Office. “ASME” is the trademark of The American Society of Mechanical Engineers. No part of this document may be reproduced in any form, in an electronic retrieval system or otherwise, without the prior written permission of the publisher. Library of Congress Catalog Card Number: 56-3934 Printed in the United States of America Adopted by the Council of The American Society of Mechanical Engineers, 1914; latest edition 2013. The American Society of Mechanical Engineers Two Park Avenue, New York, NY 10016-5990 Copyright © 2013 by THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS All rights reserved TABLE OF CONTENTS List of Sections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Foreword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Statement of Policy on the Use of the Certification Mark and Code Authorization in Advertising . . . . . . . . . . . . Statement of Policy on the Use of ASME Marking to Identify Manufactured Items . . . . . . . . . . . . . . . . . . . . . . . . Submittal of Technical Inquiries to the Boiler and Pressure Vessel Standards Committees . . . . . . . . . . . . . . . . . Personnel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Preamble . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Summary of Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . List of Changes in Record Number Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cross-Referencing and Stylistic Changes in the Boiler and Pressure Vessel Code . . . . . . . . . . . . . . . . . . . . . . . . . Part PG PG-1 PG-2 PG-3 PG-4 PG-5 PG-6 PG-7 PG-8 PG-9 PG-10 PG-11 PG-12 PG-13 PG-14 PG-16 PG-17 PG-18 PG-19 PG-20 PG-21 PG-22 PG-23 PG-25 PG-26 PG-27 PG-28 PG-29 PG-30 PG-31 PG-32 PG-33 PG-34 General Requirements for all Methods of Construction . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Service Limitations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Referenced Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Units . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Plate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Forgings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Castings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Pipes, Tubes, and Pressure‐Containing Parts . . . . . . . . . . . . . . . . . . . . . . . . . . Material Identified with or Produced to a Specification not Permitted by this Section, and Material not Fully Identified . . . . . . . . . . . . . . . . . . . . . . . . . . . Miscellaneous Pressure Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Water Level Indicators and Connector Material . . . . . . . . . . . . . . . . . . . . . . . . Stays . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rivets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Fabrication by a Combination of Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Design Validation by Proof Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cold Forming of Austenitic Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cold Forming Of Creep Strength Enhanced Ferritic Steels . . . . . . . . . . . . . . . Maximum Allowable Working Pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Loadings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Stress Values for Calculation Formulas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Quality Factors for Steel Castings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Weld Joint Strength Reduction Factor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cylindrical Components Under Internal Pressure . . . . . . . . . . . . . . . . . . . . . . . Components Under External Pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Dished Heads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Stayed Dished Heads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Unstayed Flat Heads and Covers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Openings and Compensation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Openings in Shells, Headers, and Dished Heads . . . . . . . . . . . . . . . . . . . . . . . . Compensation Required for Openings in Shells and Dished Heads . . . . . . . . Flanged‐in Openings in Formed Heads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iii xii xiv xvi xvi xvii xix xxxiv xxxvi xliii xlvii 1 1 1 1 1 1 2 2 3 3 3 3 6 7 8 9 9 9 9 10 10 10 10 10 13 13 13 15 15 19 21 22 23 26 26 27 28 PG-35 PG-36 PG-37 PG-38 PG-39 PG-42 PG-43 PG-44 PG-46 PG-47 PG-48 PG-49 PG-52 PG-53 PG-55 PG-58 PG-59 PG-60 PG-61 PG-67 PG-68 PG-69 PG-70 PG-71 PG-72 PG-73 PG-75 PG-76 PG-77 PG-78 PG-79 PG-80 PG-81 PG-82 PG-90 PG-91 PG-93 PG-99 PG-101 PG-104 PG-105 PG-106 PG-107 PG-108 PG-109 PG-110 PG-111 PG-112 Compensation Required for Openings in Flat Unstayed Heads and Flat Stayed Plates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Limits of Metal Available for Compensation . . . . . . . . . . . . . . . . . . . . . . . . . . . Strength of Compensation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Compensation for Multiple Openings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Methods of Attachment of Pipe and Nozzle Necks to Vessel Walls . . . . . . . . General Requirements for Fittings, Flanges, and Valves . . . . . . . . . . . . . . . . . Nozzle Neck Thickness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Inspection Openings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Stayed Surfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Staybolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Location of Staybolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Dimensions of Staybolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Ligaments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Ligaments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Supports and Attachment Lugs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Boiler External Piping and Boiler Proper Connections . . . . . . . . . . . . . . . . . . Outlets and External Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Application Requirements for the Boiler Proper . . . . . . . . . . . . . . . . . . . . . . . . Design and Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Design and Application Requirements for Miscellaneous Pipe, Valves, and Fittings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Feedwater Supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Overpressure Protection Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Superheater and Reheater . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Certification of Capacity of Pressure Relief Valves . . . . . . . . . . . . . . . . . . . . . . Capacity of Pressure Relief Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Mounting of Pressure Relief Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Operation of Pressure Relief Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Minimum Requirements for Pressure Relief Valves . . . . . . . . . . . . . . . . . . . . . Fabrication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cutting Plates and Other Stock . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Plate Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Repairs of Defects in Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Tube Holes and Ends . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Permissible Out‐of‐Roundness of Cylindrical Shells . . . . . . . . . . . . . . . . . . . . . Tolerance for Formed Heads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Holes for Stays . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Inspection and Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Qualification of Inspectors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Examination and Repair of Flat Plate in Corner Joints . . . . . . . . . . . . . . . . . . . Hydrostatic Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Certification by Stamping and Data Reports . . . . . . . . . . . . . . . . . . . . . . . . . . . Heating Surface Computation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Certification Marks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Stamping of Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Field Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Stamping for Field‐Assembled Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Stamping of Pressure Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Stamping of Boiler Pressure Relief Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Location of Stampings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Manufacturer’s Data Report Forms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv 28 31 32 32 32 33 37 37 37 38 38 38 38 41 43 43 43 49 50 50 53 54 54 57 58 65 65 68 68 72 72 72 72 73 73 73 73 73 73 73 75 75 75 76 76 76 77 79 81 82 82 82 83 83 PG-113 Part PW PW-1 PW-5 PW-8 PW-9 PW-10 PW-11 PW-13 PW-14 PW-15 PW-16 PW-19 PW-26 PW-27 PW-28 PW-29 PW-31 PW-33 PW-34 PW-35 PW-36 PW-38 PW-39 PW-40 PW-41 PW-42 PW-43 PW-44 PW-46 PW-47 PW-48 PW-49 PW-50 PW-51 PW-52 PW-53 PW-54 Part PR PR-1 PR-2 PR-3 PR-4 PR-5 PR-6 PR-7 Master Data Report Form . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85 Requirements for Boilers Fabricated by Welding . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Design of Welded Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Heat Treatment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Volumetric Examination of Welded Butt Joints . . . . . . . . . . . . . . . . . . . . . . . . . Head‐to‐Flange Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Openings in or Adjacent to Welds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Welded Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Minimum Requirements for Attachment Welds . . . . . . . . . . . . . . . . . . . . . . . . Welded‐In Stays . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Fabrication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Welding Processes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Welding Qualification and Weld Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Base Metal Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Alignment Tolerance, Shells and Vessels (Including Pipe or Tube Used as a Shell) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Alignment, Tube and Pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Finished Longitudinal and Circumferential Joints . . . . . . . . . . . . . . . . . . . . . . . Miscellaneous Welding Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Preheating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Requirements for Postweld Heat Treatment . . . . . . . . . . . . . . . . . . . . . . . . . . . Repair of Defects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Circumferential Joints in Pipes, Tubes, and Headers . . . . . . . . . . . . . . . . . . . . Joints in Valves and Other Boiler Appurtenances . . . . . . . . . . . . . . . . . . . . . . . Loading on Structural Attachments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Fabrication Rules for Bimetallic Tubes When the Clad Strength is Included Inspection and Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Check of Welding Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Check of Welder and Welding Operator Performance Qualifications . . . . . . . Check of Heat Treatment Practice . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Qualification of Nondestructive Examination Personnel . . . . . . . . . . . . . . . . . Radiographic Examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Ultrasonic Examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Test Plates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Hydrostatic Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86 86 86 86 86 87 87 87 88 88 88 88 88 91 96 97 97 97 98 99 99 100 100 100 100 101 101 112 113 114 114 116 119 119 119 119 119 119 119 120 120 124 Requirements for Boilers Fabricated by Riveting . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Responsibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Strength of Plates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Strength of Rivets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Crushing/Compressive Strength of Plates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 126 126 126 126 126 126 126 126 126 126 126 v PR-8 PR-9 PR-10 PR-11 PR-12 PR-13 PR-14 PR-15 PR-16 PR-17 PR-18 PR-19 PR-20 PR-21 PR-22 PR-23 PR-24 PR-25 PR-26 PR-27 PR-28 Part PB PB-1 PB-5 PB-6 PB-7 PB-8 PB-9 PB-10 PB-14 PB-15 PB-16 PB-17 PB-18 PB-19 PB-26 PB-28 PB-29 PB-30 PB-31 PB-32 PB-33 PB-46 PB-47 PB-48 PB-49 PB-50 PB-51 Joint Efficiency and the Thickness of Shells and Drums . . . . . . . . . . . . . . . . . Thickness of Buttstraps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Longitudinal Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Circumferential Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Transverse Pitch (Back Pitch) of Rows of Rivets . . . . . . . . . . . . . . . . . . . . . . . Preparation of Plate Edges for Calking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Edge Distance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Riveted Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Reinforcement of Openings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Reinforcing Shells of Watertube Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Fabrication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Welded Connections in Riveted Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Buttstraps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rivet Holes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Assembly of Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Riveting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Joint Tightness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Inspection, Tests, and Data Reports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Hammer Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Hydrostatic Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Data Reports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 126 127 127 127 127 128 128 128 129 129 130 130 130 130 130 131 131 131 132 132 132 132 132 Requirements for Boilers Fabricated by Brazing . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Brazing Filler Metals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Fluxes and Atmospheres . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Strength of Brazed Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Brazed Joint Efficiency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Application of Brazing Filler Metal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Permissible Types of Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Joint Clearance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Joint Brazing Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Openings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Brazed Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Fabrication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Qualification of Brazing Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Qualification of Brazers and Brazing Operators . . . . . . . . . . . . . . . . . . . . . . . . Cleaning of Surfaces to be Brazed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Clearance between Surfaces to be Brazed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Postbrazing Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Repair of Defective Brazing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Inspection and Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Check of Brazing Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Brazer and Brazing Operator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Visual Examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Exemptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Marking and Reports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 133 133 133 133 133 134 134 134 134 134 134 135 135 135 135 136 136 136 136 136 136 137 137 137 137 137 137 137 137 137 138 138 138 vi Part PWT PWT-1 PWT-5 PWT-8 PWT-9 PWT-11 PWT-12 PWT-13 PWT-14 PWT-15 Part PFT PFT-1 PFT-5 PFT-8 PFT-9 PFT-10 PFT-11 PFT-12 PFT-13 PFT-14 PFT-15 PFT-17 PFT-18 PFT-19 PFT-20 PFT-21 PFT-22 PFT-23 PFT-24 PFT-25 PFT-26 PFT-27 PFT-28 PFT-29 PFT-30 PFT-31 PFT-32 PFT-40 PFT-41 PFT-42 PFT-43 PFT-44 PFT-45 PFT-46 Requirements for Watertube Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Tubes and Pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Tube Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Staybolting Box‐Type Headers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Staying Segment of Heads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Firing Doors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Access and Firing Doors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 139 139 139 139 139 139 139 139 139 140 141 141 141 Requirements for Firetube Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Thickness Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Shell Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Attachment of Heads and Tubesheets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Tubes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Combustion Chambers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Combustion Chamber Tubesheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Plain Circular Furnaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Ring‐Reinforced Type . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Corrugated Furnaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Combined Plain Circular and Corrugated Type . . . . . . . . . . . . . . . . . . . . . . . . . Attachment of Furnaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Fireboxes and Waterlegs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Stayed Surfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Working Pressure for Stayed Curved Surfaces . . . . . . . . . . . . . . . . . . . . . . . . . Staying Horizontal Return Tube Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Staying Segments of Heads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Area Supported by Stay . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Maximum Spacing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Staybolts and Stays . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Flexible Staybolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Crown Bars and Girder Stays . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Stay Tubes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Stresses in Diagonal Stays . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Doors and Openings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Welded Door Openings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Openings in Wrapper Sheets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Fireside Access Openings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Requirements for Inspection Openings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Opening Between Boiler and Pressure Relief Valve . . . . . . . . . . . . . . . . . . . . . Domes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Requirements for Domes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Setting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Method of Support . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Piping, Fittings, and Appliances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 142 142 142 142 142 142 142 142 142 142 143 144 144 145 145 145 146 146 146 147 148 148 148 150 150 150 150 151 152 152 153 153 153 153 154 154 154 154 154 154 154 154 155 vii PFT-47 PFT-48 PFT-49 PFT-52 Part PFH PFH-1 Part PMB PMB-1 PMB-2 PMB-5 PMB-8 PMB-9 PMB-10 PMB-11 PMB-12 PMB-13 PMB-14 PMB-15 PMB-16 PMB-17 PMB-21 Part PEB PEB-1 PEB-2 PEB-3 PEB-5 PEB-8 PEB-9 PEB-10 PEB-11 PEB-12 PEB-13 PEB-14 PEB-15 PEB-16 PEB-17 PEB-18 PEB-19 Part PVG PVG-1 PVG-5 PVG-8 PVG-9 PVG-10 Water Level Indicators Feed Piping . . . . . . . . . Blowoff Piping . . . . . . . ................... ............................................. ............................................. ............................................. ............................................. 155 156 156 156 Optional Requirements for Feedwater Heater (When Located within Scope of Section I Rules) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ................................................................ 157 157 Requirements for Miniature Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Welding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Washout Openings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Feedwater Supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Blowoff . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Water Gages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Fixtures and Fittings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Pressure Relief Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Steam Stop Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Automatic Devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Hydrostatic Tests and Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 158 158 158 158 158 158 158 158 158 158 159 159 159 159 159 159 159 159 Requirements for Electric Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Optional Requirements for the Boiler Pressure Vessel . . . . . . . . . . . . . . . . . . Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Welding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Inspection Openings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Feedwater Supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Blowoff . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Water Level Indicators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Pressure Gages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Pressure Relief Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Automatic Devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Hydrostatic Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Inspection and Stamping of Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Manufacturer’s Data Report for Electric Boilers . . . . . . . . . . . . . . . . . . . . . . . . 160 160 160 160 160 160 160 161 161 161 161 161 161 161 161 161 162 162 162 163 Requirements for Organic Fluid Vaporizers . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Gage Glasses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 164 164 164 164 164 164 164 164 164 viii PVG-11 PVG-12 Drain Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Pressure Relief Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 164 164 Part PHRSG PHRSG-1 PHRSG-2 PHRSG-3 Requirements for Heat Recovery Steam Generators . . . . . . . . . . . . . . . . . General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Requirements for Superheater and Reheater Condensate Removal Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Desuperheater Drain Pots . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Certification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 166 166 166 ................................................................ 170 Mandatory Appendix II Standard Units for Use in Equations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 171 Mandatory Appendix III Criteria for Reapplication of a Certification Mark . . . . . . . . . . . . . . . . . . . 172 Mandatory Appendix IV Local Thin Areas in Cylindrical Shells and in Spherical Segments of Heads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 175 Mandatory Appendix V Additional Rules for Boilers Fabricated by Riveting . . . . . . . . . . . . . . . . . 179 Mandatory Appendix VI Establishing Governing Code Editions, Addenda, and Cases for Boilers and Replacement Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 183 Explanation of the Code Containing Matter not Mandatory Unless Specifically Referred to in the Rules of the Code . . . . . . . . . . . . . . . . . . 185 Positive Material Identification Practice . . . . . . . . . . . . . . . . . . . . . . . . . . . . 278 PHRSG-4 PHRSG-5 Mandatory Appendix I Nonmandatory Appendix A Nonmandatory Appendix B FIGURES PG-28 PG-31 PG-33.1 PG-33.2 PG-33.3 PG-38 PG-42.1 PG-46.2 PG-52.1 PG-52.2 PG-52.3 PG-52.4 PG-52.5 PG-53.3 PG-58.3.1(a) PG-58.3.1(b) PG-58.3.1(c) PG-58.3.2 PG-58.3.3 PG-59.1 PG-60.3.7 PG-60.3.9 PG-67.4 Maximum Internal Projection of Welded Access or Inspection Openings . . . . . . . . . . . . . . . . . . Some Acceptable Types of Unstayed Flat Heads and Covers . . . . . . . . . . . . . . . . . . . . . . . . . . . . Nomenclature and Equations for Reinforced Openings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Some Representative Configurations Describing the Dimensions t e , h , and d . . . . . . . . . . . . . . Chart for Determining Value of F . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Illustrations of the Rule Given in PG-38.4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Welding End Transitions Maximum Envelope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Acceptable Proportions for Ends of Through‐Stays . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Diagram for Determining the Efficiency of Longitudinal and Diagonal Ligaments Between Openings in Cylindrical Shells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Example of Tube Spacing with Pitch of Holes Equal in Every Row . . . . . . . . . . . . . . . . . . . . . . . Example of Tube Spacing with Pitch of Holes Unequal in Every Second Row . . . . . . . . . . . . . . Example of Tube Spacing with Pitch of Holes Varying in Every Second and Third Row . . . . . . Example of Tube Spacing with Tube Holes on Diagonal Lines . . . . . . . . . . . . . . . . . . . . . . . . . . . Diagram for Determining Equivalent Longitudinal Efficiency of Diagonal Ligaments Between Openings in Cylindrical Shells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Code Jurisdictional Limits for Piping — Drum‐Type Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Code Jurisdictional Limits for Piping — Isolable Economizers Located in Feedwater Piping and Isolable Superheaters in Main Steam Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Code Jurisdictional Limits for Piping — Reheaters and Nonintegral Separately Fired Superheaters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Code Jurisdictional Limits for Piping — An Example of Forced‐Flow Steam Generators with no Fixed Steam or Waterline . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Code Jurisdictional Limits for Piping — An Example of Steam Separator Type Forced-Flow Steam Generators with no Fixed Steam or Waterline . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Typical Boiler Bushings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Y‐Type Globe Valve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Typical Arrangement of Steam and Water Connections for a Water Column . . . . . . . . . . . . . . . Requirements for Overpressure Protection Forced‐Flow Steam Generator . . . . . . . . . . . . . . . . ix 166 166 167 20 24 29 30 31 33 36 38 39 40 40 40 41 42 44 45 46 47 48 50 52 53 56 PG-80 PG-105.1 PG-106 PW-9.1 PW-9.2 PW-15 PW-16.1 PW-16.2 PW-19.4(a) PW-19.4(b) PW-43.1 PW-43.2 PW-53.1 PW-53.2 PW-53.3(a) PW-53.3(b) PR-13-1 PR-15.4-1 PR-17.2-1 PR-20.2-1 PB-15 PWT-11 PWT-12.1 PWT-12.2 PFT-12.1 PFT-17.2 PFT-18.1 PFT-19 PFT-20 PFT-21 PFT-23.1 PFT-25 PFT-27 PFT-32 PFT-46.1 PFT-46.2 PVG-12 PHRSG-4 TABLES PG-19 PG-20 PG-26 PG-39 PG-68.7 PG-68.7M PG-69.2.3 Maximum Permissible Deviation from a Circular Form, e , for Cylindrical Parts Under External Pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Official Certification Mark to Denote the American Society of Mechanical Engineers’ Standard for Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form of Stamping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Butt Welding of Plates of Unequal Thickness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Prohibited Welded Joint . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Examples of Weld Strength Calculations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Some Acceptable Types of Welded Nozzles and Other Connections to Shells, Drums, and Headers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Some Acceptable Forms of Welds for Lugs, Hangers, and Brackets on Shells, Drums, and Headers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Some Acceptable Types of Diagonal Braces for Installation by Welding . . . . . . . . . . . . . . . . . . . Unacceptable Types of Diagonal Braces for Installation by Welding . . . . . . . . . . . . . . . . . . . . . . Method of Computation of Attachments to Tubes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Chart for Determining Load Factor, L f . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Test Specimens from Longitudinal Welded Test Plates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Method of Forming Longitudinal Test Plates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Details of Tension Test Specimens . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Details of Bend Test Specimens . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Typical Plate Edge Beveled for Sealing by Calking in a Riveted Joint . . . . . . . . . . . . . . . . . . . . . Location of Seams in Inside and Outside Calking Boundaries . . . . . . . . . . . . . . . . . . . . . . . . . . . . Boundary of Reinforcing Plate on Outside and Inside of Drum . . . . . . . . . . . . . . . . . . . . . . . . . . Allowable Welding of Plate Edges at Ends of Buttstraps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Some Acceptable Types of Brazed Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Examples of Acceptable Forms of Tube Attachment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Box‐Type Header Joint . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Method of Forming Waterleg Joints by Welding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Some Acceptable Forms of Tube Attachment on Firetube Boilers . . . . . . . . . . . . . . . . . . . . . . . . Acceptable Type of Ring‐Reinforced Furnace . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Morison Furnace . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Connection Between Plain and Corrugated Furnace . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Welding Ogee Ring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Some Acceptable Methods of Forming Waterleg Joints by Welding . . . . . . . . . . . . . . . . . . . . . . . Stayed Wrapper Sheet of Locomotive‐Type Boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Example of Staying of Heads Adjacent to Cylindrical Furnaces . . . . . . . . . . . . . . . . . . . . . . . . . . Pitch of Staybolts Adjacent to Upper Corners of Fireboxes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Measurements for Determining Stresses in Diagonal Stays . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Spacing and Weld Details for Wall‐Support Lugs Set in Pairs on Horizontal‐Return Tubular Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Welded Bracket Connection for Horizontal‐Return Tubular Boilers . . . . . . . . . . . . . . . . . . . . . . Constant, C , for Vapor Related to Ratio of Specific Heats (k = c p /c v ) . . . . . . . . . . . . . . . . . . . . . Some Acceptable Desuperheater Spraywater Protection Device Arrangements . . . . . . . . . . . . . Guide for Completing the Certificate of Conformance for Reapplication of the Certification Mark . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Post Cold‐Forming Strain Limits and Heat‐Treatment Requirements . . . . . . . . . . . . . . . . . . . . . . Post Cold‐Forming Strain Limits And Heat‐Treatment Requirements . . . . . . . . . . . . . . . . . . . . . . Weld Strength Reduction Factors to be Applied When Calculating Maximum Allowable Working Pressure or Minimum Required Thickness of Components Fabricated With a Longitudinal Seam Weld . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Minimum Number of Threads Per Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Superheat Correction Factor, K s h . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Superheat Correction Factor, K s h . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Supercritical Correction Factor, K s c . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . x 74 77 79 87 88 90 92 96 97 98 115 116 121 122 123 124 128 129 130 131 135 140 141 141 143 145 146 147 147 148 149 150 151 153 155 156 165 168 174 11 12 16 34 59 61 64 PG-69.2.3M PW-11 PW-33 PW-39-1 PW-39-2 PW-39-3 PW-39-4 PW-39-5 PW-39-6 PW-39-7 PW-39-8 PW-39-9 PW-39-10 PW-39-11 PW-39-12 PW-39-13 PW-39-14 PW-39.1 PW-43.1 PR-9-1 PR-15.3-1 PB-1 PB-16 PHRSG-4 FORMS III-1A P-2 P-2A P-2B P-3 P-3A P-4 P-4A P-4B P-5 P-6 P-7 P-8 Supercritical Correction Factor, K s c . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Required Volumetric Examination of Welded Butt Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Alignment Tolerance of Sections to be Butt Welded . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments — P-No. 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments — P-No. 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments — P-No. 4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments — P-No. 5A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments — P-No. 15E . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments — P-No. 6 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments — P-No. 7 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments — P-No. 8 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments — P-No. 10H . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments — P-No. 10I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments — P-No. 31 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments — P-No. 43 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments — P-No. 45 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments — P-No. 51 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Alternate Postweld Heat Treatment Requirements for Carbon and Low Alloy Steels . . . . . . . . . Tube Attachment Angle Design Factor, K . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Minimum Thickness of Buttstraps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Allowable Stress on Rivets in Tension . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Maximum Design Temperatures [°F (°C)] for Brazing Filler Metal . . . . . . . . . . . . . . . . . . . . . . . . Recommended Joint Clearance at Brazing Temperature . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Minimum Drain Pot Size . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Certificate of Conformance for Reapplication of the Certification Mark . . . . . . . . . . . . . . . . . . . . . . . . Manufacturer’s Data Report for all Types of Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Manufacturer’s Data Report for all Types of Electric Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Manufacturer’s Data Report for Electric Superheaters and Reheaters . . . . . . . . . . . . . . . . . . . . . . . . . . Manufacturer’s Data Report for Watertube Boilers, Superheaters, Waterwalls, and Economizers . . Engineering-Contractor Data Report for a Complete Boiler Unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Manufacturer’s Partial Data Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Manufacturer’s Data Report for Fabricated Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Manufacturer’s Data Report for Field Installed Mechanically Assembled Piping . . . . . . . . . . . . . . . . . Summary Data Report for Process Steam Generators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Manufacturer’s Data Report Supplementary Sheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Manufacturer’s Data Report for Pressure Relief Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Manufacturer’s or Assembler’s Certificate of Conformance for Pressure Relief Valves . . . . . . . . . . . . xi 66 89 100 102 103 104 105 106 107 108 108 109 109 110 110 111 111 112 115 127 129 134 136 169 173 230 234 239 243 248 251 254 257 259 261 262 266 LIST OF SECTIONS ð13Þ SECTIONS I Rules for Construction of Power Boilers II Materials • Part A — Ferrous Material Specifications • Part B — Nonferrous Material Specifications • Part C — Specifications for Welding Rods, Electrodes, and Filler Metals • Part D — Properties (Customary) • Part D — Properties (Metric) III Rules for Construction of Nuclear Facility Components • Subsection NCA — General Requirements for Division 1 and Division 2 • Appendices • Division 1 – Subsection NB — Class 1 Components – Subsection NC — Class 2 Components – Subsection ND — Class 3 Components – Subsection NE — Class MC Components – Subsection NF — Supports – Subsection NG — Core Support Structures – Subsection NH — Class 1 Components in Elevated Temperature Service • Division 2 — Code for Concrete Containments • Division 3 — Containments for Transportation and Storage of Spent Nuclear Fuel and High Level Radioactive Material and Waste • Division 5 — High Temperature Reactors IV Rules for Construction of Heating Boilers V Nondestructive Examination VI Recommended Rules for the Care and Operation of Heating Boilers VII Recommended Guidelines for the Care of Power Boilers VIII Rules for Construction of Pressure Vessels • Division 1 • Division 2 — Alternative Rules • Division 3 — Alternative Rules for Construction of High Pressure Vessels IX Welding, Brazing, and Fusing Qualifications X Fiber-Reinforced Plastic Pressure Vessels XI Rules for Inservice Inspection of Nuclear Power Plant Components XII Rules for Construction and Continued Service of Transport Tanks xii INTERPRETATIONS ASME issues written replies to inquiries concerning interpretation of technical aspects of the Code. Interpretations of the Code are posted in January and July at http://cstools.asme.org/interpretations.cfm. Any Interpretations issued during the previous two calendar years are included with the publication of the applicable Section of the Code. Interpretations of Section III, Divisions 1 and 2 and Section III Appendices are included with Subsection NCA. CODE CASES The Boiler and Pressure Vessel Code committees meet regularly to consider proposed additions and revisions to the Code and to formulate Cases to clarify the intent of existing requirements or provide, when the need is urgent, rules for materials or constructions not covered by existing Code rules. Those Cases that have been adopted will appear in the appropriate 2013 Code Cases book: “Boilers and Pressure Vessels” or “Nuclear Components.” Supplements will be sent automatically to the purchasers of the Code Cases books up to the publication of the 2015 Code. xiii ð13Þ FOREWORD (This Foreword is provided as an aid to the user and is not part of the rules of this Code.) In 1911, The American Society of Mechanical Engineers established the Boiler and Pressure Vessel Committee to formulate standard rules for the construction of steam boilers and other pressure vessels. In 2009, the Boiler and Pressure Vessel Committee was superseded by the following committees: (a) Committee on Power Boilers (I) (b) Committee on Materials (II) (c) Committee on Construction of Nuclear Facility Components (III) (d) Committee on Heating Boilers (IV) (e) Committee on Nondestructive Examination (V) (f) Committee on Pressure Vessels (VIII) (g) Committee on Welding, Brazing, and Fusing (IX) (h) Committee on Fiber-Reinforced Plastic Pressure Vessels (X) (i) Committee on Nuclear Inservice Inspection (XI) (j) Committee on Transport Tanks (XII) Where reference is made to “the Committee” in this Foreword, each of these committees is included individually and collectively. The Committee's function is to establish rules of safety relating only to pressure integrity, which govern the construction* of boilers, pressure vessels, transport tanks, and nuclear components, and the inservice inspection of nuclear components and transport tanks. The Committee also interprets these rules when questions arise regarding their intent. This Code does not address other safety issues relating to the construction of boilers, pressure vessels, transport tanks, or nuclear components, or the inservice inspection of nuclear components or transport tanks. Users of the Code should refer to the pertinent codes, standards, laws, regulations, or other relevant documents for safety issues other than those relating to pressure integrity. Except for Sections XI and XII, and with a few other exceptions, the rules do not, of practical necessity, reflect the likelihood and consequences of deterioration in service related to specific service fluids or external operating environments. In formulating the rules, the Committee considers the needs of users, manufacturers, and inspectors of pressure vessels. The objective of the rules is to afford reasonably certain protection of life and property, and to provide a margin for deterioration in service to give a reasonably long, safe period of usefulness. Advancements in design and materials and evidence of experience have been recognized. This Code contains mandatory requirements, specific prohibitions, and nonmandatory guidance for construction activities and inservice inspection and testing activities. The Code does not address all aspects of these activities and those aspects that are not specifically addressed should not be considered prohibited. The Code is not a handbook and cannot replace education, experience, and the use of engineering judgment. The phrase engineering judgement refers to technical judgments made by knowledgeable engineers experienced in the application of the Code. Engineering judgments must be consistent with Code philosophy, and such judgments must never be used to overrule mandatory requirements or specific prohibitions of the Code. The Committee recognizes that tools and techniques used for design and analysis change as technology progresses and expects engineers to use good judgment in the application of these tools. The designer is responsible for complying with Code rules and demonstrating compliance with Code equations when such equations are mandatory. The Code neither requires nor prohibits the use of computers for the design or analysis of components constructed to the requirements of the Code. However, designers and engineers using computer programs for design or analysis are cautioned that they are responsible for all technical assumptions inherent in the programs they use and the application of these programs to their design. * Construction, as used in this Foreword, is an all-inclusive term comprising materials, design, fabrication, examination, inspection, testing, certification, and pressure relief. xiv The rules established by the Committee are not to be interpreted as approving, recommending, or endorsing any proprietary or specific design, or as limiting in any way the manufacturer's freedom to choose any method of design or any form of construction that conforms to the Code rules. The Committee meets regularly to consider revisions of the rules, new rules as dictated by technological development, Code Cases, and requests for interpretations. Only the Committee has the authority to provide official interpretations of this Code. Requests for revisions, new rules, Code Cases, or interpretations shall be addressed to the Secretary in writing and shall give full particulars in order to receive consideration and action (see Submittal of Technical Inquiries to the Boiler and Pressure Vessel Standards Committees). Proposed revisions to the Code resulting from inquiries will be presented to the Committee for appropriate action. The action of the Committee becomes effective only after confirmation by ballot of the Committee and approval by ASME. Proposed revisions to the Code approved by the Committee are submitted to the American National Standards Institute (ANSI) and published at http://cstools.asme.org/csconnect/public/index.cfm?PublicReview=Revisions to invite comments from all interested persons. After public review and final approval by ASME, revisions are published at regular intervals in Editions of the Code. The Committee does not rule on whether a component shall or shall not be constructed to the provisions of the Code. The scope of each Section has been established to identify the components and parameters considered by the Committee in formulating the Code rules. Questions or issues regarding compliance of a specific component with the Code rules are to be directed to the ASME Certificate Holder (Manufacturer). Inquiries concerning the interpretation of the Code are to be directed to the Committee. ASME is to be notified should questions arise concerning improper use of an ASME Certification Mark. When required by context in this Section, the singular shall be interpreted as the plural, and vice versa, and the feminine, masculine, or neuter gender shall be treated as such other gender as appropriate. xv STATEMENT OF POLICY ON THE USE OF THE CERTIFICATION MARK AND CODE AUTHORIZATION IN ADVERTISING ASME has established procedures to authorize qualified organizations to perform various activities in accordance with the requirements of the ASME Boiler and Pressure Vessel Code. It is the aim of the Society to provide recognition of organizations so authorized. An organization holding authorization to perform various activities in accordance with the requirements of the Code may state this capability in its advertising literature. Organizations that are authorized to use the Certification Mark for marking items or constructions that have been constructed and inspected in compliance with the ASME Boiler and Pressure Vessel Code are issued Certificates of Authorization. It is the aim of the Society to maintain the standing of the Certification Mark for the benefit of the users, the enforcement jurisdictions, and the holders of the Certification Mark who comply with all requirements. Based on these objectives, the following policy has been established on the usage in advertising of facsimiles of the Certification Mark, Certificates of Authorization, and reference to Code construction. The American Society of Mechanical Engineers does not “approve,” “certify,” “rate,” or “endorse” any item, construction, or activity and there shall be no statements or implications that might so indicate. An organization holding the Certification Mark and/or a Certificate of Authorization may state in advertising literature that items, constructions, or activities “are built (produced or performed) or activities conducted in accordance with the requirements of the ASME Boiler and Pressure Vessel Code,” or “meet the requirements of the ASME Boiler and Pressure Vessel Code.” An ASME corporate logo shall not be used by any organization other than ASME. The Certification Mark shall be used only for stamping and nameplates as specifically provided in the Code. However, facsimiles may be used for the purpose of fostering the use of such construction. Such usage may be by an association or a society, or by a holder of the Certification Mark who may also use the facsimile in advertising to show that clearly specified items will carry the Certification Mark. General usage is permitted only when all of a manufacturer’s items are constructed under the rules. STATEMENT OF POLICY ON THE USE OF ASME MARKING TO IDENTIFY MANUFACTURED ITEMS The ASME Boiler and Pressure Vessel Code provides rules for the construction of boilers, pressure vessels, and nuclear components. This includes requirements for materials, design, fabrication, examination, inspection, and stamping. Items constructed in accordance with all of the applicable rules of the Code are identified with the official Certification Mark described in the governing Section of the Code. Markings such as “ASME,” “ASME Standard,” or any other marking including “ASME” or the Certification Mark shall not be used on any item that is not constructed in accordance with all of the applicable requirements of the Code. Items shall not be described on ASME Data Report Forms nor on similar forms referring to ASME that tend to imply that all Code requirements have been met when, in fact, they have not been. Data Report Forms covering items not fully complying with ASME requirements should not refer to ASME or they should clearly identify all exceptions to the ASME requirements. xvi ð13Þ SUBMITTAL OF TECHNICAL INQUIRIES TO THE BOILER AND PRESSURE VESSEL STANDARDS COMMITTEES 1 INTRODUCTION (a) The following information provides guidance to Code users for submitting technical inquiries to the committees. See Guideline on the Approval of New Materials Under the ASME Boiler and Pressure Vessel Code in Section II, Parts C and D for additional requirements for requests involving adding new materials to the Code. Technical inquiries include requests for revisions or additions to the Code rules, requests for Code Cases, and requests for Code Interpretations, as described below. (1) Code Revisions. Code revisions are considered to accommodate technological developments, address administrative requirements, incorporate Code Cases, or to clarify Code intent. (2) Code Cases. Code Cases represent alternatives or additions to existing Code rules. Code Cases are written as a question and reply, and are usually intended to be incorporated into the Code at a later date. When used, Code Cases prescribe mandatory requirements in the same sense as the text of the Code. However, users are cautioned that not all jurisdictions or owners automatically accept Code Cases. The most common applications for Code Cases are: (-a) to permit early implementation of an approved Code revision based on an urgent need (-b) to permit the use of a new material for Code construction (-c) to gain experience with new materials or alternative rules prior to incorporation directly into the Code (3) Code Interpretations. Code Interpretations provide clarification of the meaning of existing rules in the Code, and are also presented in question and reply format. Interpretations do not introduce new requirements. In cases where existing Code text does not fully convey the meaning that was intended, and revision of the rules is required to support an interpretation, an Intent Interpretation will be issued and the Code will be revised. (b) The Code rules, Code Cases, and Code Interpretations established by the committees are not to be considered as approving, recommending, certifying, or endorsing any proprietary or specific design, or as limiting in any way the freedom of manufacturers, constructors, or owners to choose any method of design or any form of construction that conforms to the Code rules. (c) Inquiries that do not comply with these provisions or that do not provide sufficient information for a committee’s full understanding may result in the request being returned to the inquirer with no action. 2 INQUIRY FORMAT Submittals to a committee shall include: (a) Purpose. Specify one of the following: (1) revision of present Code rules (2) new or additional Code rules (3) Code Case (4) Code Interpretation (b) Background. Provide the information needed for the committee’s understanding of the inquiry, being sure to include reference to the applicable Code Section, Division, Edition, Addenda (if applicable), paragraphs, figures, and tables. Preferably, provide a copy of the specific referenced portions of the Code. (c) Presentations. The inquirer may desire or be asked to attend a meeting of the committee to make a formal presentation or to answer questions from the committee members with regard to the inquiry. Attendance at a committee meeting shall be at the expense of the inquirer. The inquirer’s attendance or lack of attendance at a meeting shall not be a basis for acceptance or rejection of the inquiry by the committee. xvii 3 CODE REVISIONS OR ADDITIONS Requests for Code revisions or additions shall provide the following: (a) Proposed Revisions or Additions. For revisions, identify the rules of the Code that require revision and submit a copy of the appropriate rules as they appear in the Code, marked up with the proposed revision. For additions, provide the recommended wording referenced to the existing Code rules. (b) Statement of Need. Provide a brief explanation of the need for the revision or addition. (c) Background Information. Provide background information to support the revision or addition, including any data or changes in technology that form the basis for the request that will allow the committee to adequately evaluate the proposed revision or addition. Sketches, tables, figures, and graphs should be submitted as appropriate. When applicable, identify any pertinent paragraph in the Code that would be affected by the revision or addition and identify paragraphs in the Code that reference the paragraphs that are to be revised or added. 4 CODE CASES Requests for Code Cases shall provide a Statement of Need and Background Information similar to that defined in 3(b) and 3(c), respectively, for Code revisions or additions. The urgency of the Code Case (e.g., project underway or imminent, new procedure, etc.) must be defined and it must be confirmed that the request is in connection with equipment that will bear the Certification Mark, with the exception of Section XI applications. The proposed Code Case should identify the Code Section and Division, and be written as a Question and a Reply in the same format as existing Code Cases. Requests for Code Cases should also indicate the applicable Code Editions and Addenda (if applicable) to which the proposed Code Case applies. 5 CODE INTERPRETATIONS (a) Requests for Code Interpretations shall provide the following: (1) Inquiry. Provide a condensed and precise question, omitting superfluous background information and, when possible, composed in such a way that a “yes” or a “no” Reply, with brief provisos if needed, is acceptable. The question should be technically and editorially correct. (2) Reply. Provide a proposed Reply that will clearly and concisely answer the Inquiry question. Preferably, the Reply should be “yes” or “no,” with brief provisos if needed. (3) Background Information. Provide any background information that will assist the committee in understanding the proposed Inquiry and Reply. (b) Requests for Code Interpretations must be limited to an interpretation of a particular requirement in the Code or a Code Case. The committee cannot consider consulting type requests such as the following: (1) a review of calculations, design drawings, welding qualifications, or descriptions of equipment or parts to determine compliance with Code requirements; (2) a request for assistance in performing any Code-prescribed functions relating to, but not limited to, material selection, designs, calculations, fabrication, inspection, pressure testing, or installation; (3) a request seeking the rationale for Code requirements. 6 SUBMITTALS Submittals to and responses from the committees shall meet the following: (a) Submittal. Inquiries from Code users shall be in English and preferably be submitted in typewritten form; however, legible handwritten inquiries will also be considered. They shall include the name, address, telephone number, fax number, and e-mail address, if available, of the inquirer and be mailed to the following address: Secretary ASME Boiler and Pressure Vessel Committee Two Park Avenue New York, NY 10016-5990 As an alternative, inquiries may be submitted via e-mail to: [email protected]. (b) Response. The Secretary of the appropriate committee shall acknowledge receipt of each properly prepared inquiry and shall provide a written response to the inquirer upon completion of the requested action by the committee. xviii
- Xem thêm -

Tài liệu liên quan