Mô tả:
Boiler & Auxiliaries Erection Presentation
4000MW
Date
Department
800 MW Large Capacity
Coal Fired Steam Generator
4000MW ULTRA MEGA POWER
PROJECT
Power Boiler Design Team
Thermal Power Plant Business Group
M
UNDR
MUNDRA
2
)
SUPERCRITICAL
COAL
FIRED
STEAM
GENERATOR
Supercritical Coal Fired Steam Generator
A
BOILER SPEC.
DESCRIPTION OF COMPONENTS
Thermal Power Plant
ULTRA MEGA POWER PLANT
Units1 ~75&( 800MW
8 (500MW
UNIT
X5) x
1 FEED WATER PIPE
REHEATER REAR FINAL
32
ASSEMBLIES
BOILER TYPE
Supercritical OnceThru Boiler
MAIN
STEAM Ton/Hr
1,672
REHEA
TER
Ton/Hr
1,325
MAIN
STEAM Kg/cm2g
255
REHEA
TER
Kg/cm2g
53.6
2
ECONOMIZER INLET
HEADER
33
REHEATER OUTLET
HEADER
3
ECONOMIZER
ASSEMBLIES
34
REHEATER OUTLET PIPES
(HRH)
4
ECONOMIZER HANGER
TUBES
35 FLASH TANK VENT PIPE
5
ECONOMIZER HANGER
TUBE OUTLET HEADER
36
SILENCERS (PSV, ERV,
START UP VENT)
6
FURNACE LOWER RING
HEADERS
37
F.D. FAN SUCTION
W/SILENCERS
7
FURNACE SPIRAL W/W
TUBES
38 FORCED DRAFT FANS
SECONDARY AIR DUCT
FURNACE VERTICAL W/W
39 TO GAS AIR
TUBES
PREHEATERS
FUEL
8
9
FURNACE UPP. FRONT
HEADER
40
10
FURNACE UPP. REAR
HEADER
41 GAS AIR PREHEATERS
SYSTEM
Burners
DRAFTOBSERVATION DOORS
Balanced
STSTEM
WALL BLOWER
FURNACE
Spiral Wound /
TYPE
Vertical Wall
STEAM COIL AIR
HEATERS
HOT SECONDARY AIR
DUCT TO WINDBOX
11 WATER SEPARATORS
42
SEPARATOR STORAGE
12
TANK
WINDBOX & TILTING
43
TANGETIAL BURNER
13 FLASH TANK
44
SCANNER & COOLING AIR
FANS
14
CONDENSATE RECEIVING
45 PRIMARY AIR FANS
TANK
15
CONDENSATE DRAIN
TRANSFER PUMPS
46
HOT PRIMARY AIR DUCT
TO MILLS
16
BOILER WATER
RECIRCULATING PUMP
47
COLD PRIMARY AIR DUCT
TO MILLS
17
BACKPASS LOWER SIDE
MIXED HOT AIR DUCT TO
48
HEADERS
MILLS
18
BACKPASS SIDE WALL
TUBES
49
19
BACKPASS UPPER SIDE
WALL INLET HEADERS
50 COAL SILOS
CAPA
CITY
PRES
S.
COND
ITION
MAIN
TEMP.
STEAM
COND
REHEA
ITION
ACCESS
TER DOOR
¨C
569
LEGEND &
596
ABBREVIATIONS
Hi-Vol. ¡ c¡ , Bit.
ACCESS DOOR
Coal IN ROOF
FIRINGEMCLOSURE Low Nox Tangential
RETRACTABLE SOOTBLOWERDOUBLE SIDE
HALF TRACT SOOTBLOWERDOUBLE SIDE
FURNACE TEMPERATURE
PROBE
FURNACE MONITORING
CAMERA (CCTV)
COAL TRIPPER
CONVEYOR ROOM
TURBINE BUILDING
BACKPASS LOWER REAR
20
51 COAL FEEDERS
HEADER
21
L.T.S.H. HORIZONTAL
ASSEMBLIES
52
22
L.T.S.H. PENDANT
ASSEMBLIES
53 COAL PIPNG
23 L.T.S.H. OUTLET HEADER 54
CLIENT :
COAL MILLS
(PULVERIZER)
FURNACE BOTTOM ASH
HOPPER
24
SUPERHEATER DIV.
PANELETTES
55
ECONOMIZER OUTLET
FLUE GAS DUCT
25
SUPERHEATER FINAL
INLET HEADER
56
ELECTROSTATIC
PRECIPITATOR
26
SUPERHEATER FINAL
ASSEMBLIES
57 INDUCED DRAFT FANS
27
SUPERHEATER FINAL
OUTLET HEADERS
58
ENGINEER
:
SUPERHEATER
OUTLET
28
29
PIPES (MS)
REHEATER INLET PIPES
(CRH)
REHEATER INLET
FLUE GAS DUCT TO
STACK
CONTRACTOR :
59 STACK
60
STEAM COIL AIR HEATER
DRAIN TANK
¨c
Table of Contents
1. General
2. Organization
3. Schedule
4. Steel Structure Erection
5. Temporary Works ( Boiler )
6. Construction Plans
7. Erection Procedure
1. General
1) Summary of Construction
Project Title
4000MW Mundra Ultra Mega Power Project
Type/Capacity
Supercritical One-Thru Boiler / 800 MW x 5 Units
Owner
TATA Power
Location
Mundra, Gujarat state
Scope
Boiler Island + EP System + Fuel Tank
Ordering Mode
Exclusive Bidding with TATA Power
Duration
40mths/1Unit, 56mths/5Unit, Except LD Moratorium 2mths
Major Quantity
Total : 146,923ton BLR Steel : 40,500ton Boiler : 68,798ton
EP :28,575ton Con'c : 74,738㎥ Re-bar : 4,783ton
Steel : 1,602ton Pile : 2,716(dia 600㎜ L 25m)
Cable : 1,500,000M TRAY : 70,000M CONDUIT : 50,000M
1. General
2) Steam Condition
1. General
3) Major Progress of Works
2. Organization
1) Present
2. Organization
2) Peak
현장 소장
1
부장
Contractor Adv.
1
영국
공사관리부
차장
기전부
1
관 리/인 사
과장
1
차장
공정
K
과장
1
보 일 러 (압력부)
K
과장
K
과장
K
대리
L
Engin
L
Engin
L
Engin
예산
과장
1
P.R.O*
MGR
1
Engin
2
L
Engin
3
L
2
*PRO : Public Relation Officer
2
K
K
과장
K
대리
1
1
3
3
K
1
K
`
K
L
L
Piling
전기
Engin
1
L
Engin
L
Engin
1
2
Quality
L
Engin
L
Engin
FDN
계장
Engin
1
3
L
Engin
구분
부장
차장
과장
대리
계
한국인
1
3
10
3
17
영국인
1
1
1
L
Safety
Building
배관/보온
2
1
FDN / Building
계장
과장
보 일 러 (비압력부)
자재
Engin
1
1
1
과장
Piling
전기
과장
보 일 러 (압력부)
예산
관 리/인사/노무
Office
2
K
품질/안전
1
차장
배관/보온
공정
L
회계
Staff
1
2
보 일 러 (비압력부)
자재
대리
토건부
1
L
현지인
공사관리
기전부
토건부
품질/안전
총계
12
10
4
5
31
14
13
14
8
49
2
L
3. Schedule
1) Man Power
3. Schedule
2) Equipment
3. Schedule
3) Milestone
3. Schedule
4) Detail
4. Steel Structure Erection
4. Steel Structure Erection
4. Steel Structure Erection
4. Steel Structure Erection
4. Steel Structure Erection
4. Steel Structure Erection
- Xem thêm -